Wood framing and ceiling joists at The Vivien in Vero Beach, Florida, during a Prescient Environmental framing moisture assessment
Projects

Inspection and consulting projects across DC, Maryland, Virginia and beyond

Luxury residences, hotels, hospitals, student housing and post-hurricane restoration. Every project below got the same method as a single-family inspection: document, sample, verify, report.

Bozzuto Group

The Ritz-Carlton Residences, Chevy Chase

Prescient Environmental conducted a mold and moisture assessment of the residential units at 8551 Connecticut Avenue for the building's management. The work was carried out unit by unit in an occupied luxury building, with moisture mapping and environmental measurements guiding targeted corrective actions and minimal disruption to residents. Following the corrective work, Prescient Environmental performed the verification inspections that confirmed the treated areas met the IICRC S520 criteria.

The Ritz-Carlton Residences at 8551 Connecticut Avenue, Chevy Chase, Maryland
8551 Connecticut Avenue, Chevy Chase
IHG Hotels

The Willard Hotel, Washington DC

Mold inspections and remediation oversight at one of the city's landmark hotels. The team assessed visible growth, identified elevated airborne spore levels and wrote the remediation plan. After treatment, a post-remediation verification confirmed that contaminated materials were removed, surfaces were HEPA vacuumed and air sampling met the verification criteria, releasing the areas for rebuild.

The Willard InterContinental Hotel in Washington DC
Willard InterContinental
The Hourigan Group

The Chasen Apartments, Richmond, Virginia

Hourigan engaged Prescient Environmental to support the development of The Chasen, a multi-building apartment community in Richmond, Virginia, and the project is now complete. Before construction began, the team delivered a two-hour mold awareness class for the Hourigan crew, so the general contractor and the hygienist worked from the same playbook from day one. The Three Phase Program then put inspections at the critical stages, with moisture mapping after weather events and clearance of affected buildings, and the whole team worked together using the moisture equipment Prescient recommended. The result was a smoother process for everyone on site and a schedule that held.

Prescient Environmental leading a mold awareness training session for the Hourigan construction team
Mold awareness training with the Hourigan team
More projects

Construction, hospitality, healthcare and disaster recovery

One University student apartments in Fairfax, Virginia

One University, Fairfax, Virginia · Whiting-Turner

Inspections and full oversight of remediation in the final phases of construction after water leaks, Category 3 losses and mold growth. Proactive management kept the project on schedule for student move-in.

Heavy mold growth covering the walls of a vacant apartment unit before remediation, documented during a multifamily mold inspection

Worthington Woods Apartments, Washington DC · Bozzuto

Industrial hygienist services and oversight for the full renovation: identifying mold and moisture issues and writing tailored remediation protocols for certified contractors, unit by unit.

Home2 Suites by Hilton under construction in Falls Church, Virginia

Home2 Suites by Hilton, Falls Church, Virginia · Coakley & Williams Construction

Inspections and remediation oversight of units and main areas affected by water leaks during construction, with mold prevention measures verified against industry standards. The hotel opened on time.

Aerial view of the Postcard Inn on St. Pete Beach, Florida, after Hurricanes Helene and Milton

Postcard Inn, St. Pete Beach, Florida · The LCP Group

Sewage swab sampling after Category 3 water intrusion from Hurricanes Helene and Milton, to verify disinfection and cleaning before the rooms went back into use. 312 samples plus four field blanks from flooring, wall studs and bottom plates across every impacted room and common area.

Wood framing under construction at The Vivien in Vero Beach, Florida

The Vivien, Vero Beach, Florida · CAPSOL Inc.

Framing assessment across all units and townhouses after severe weather: widespread growth and elevated moisture in nearly 65 percent of the framing. A detailed report went to the general contractor and the remediation company, and treatment of the affected framing was completed.

MedStar Georgetown University Hospital Bles Building exterior

MedStar Georgetown University Hospital · Davis Construction

Water damage inspection after a cut water line in a fourth-floor nurses lounge affected five levels of the Bles Building. Elevated moisture in porous materials and growth on sheetrock were documented, and the assessment report guided the remediation.

Konikoff Dental Associates office building

Konikoff Dental Associates · Kustom US

Post-restoration verification after Category 3 water intrusion, against the restoration protocol Prescient wrote: visual inspection, thermal and moisture assessment and surface swab sampling. No fecal coliforms detected; the space was released for reconstruction.

One Rangers Way under construction, wood framing visible on upper floors

One Rangers Way · CBG Building Company

Wood framing assessment through multiple phases of construction, confirming anti-fungal treatment of all framing in units and corridors, followed by a final verification inspection with air sampling on floors one through eight after final punch.