
Wood Framing Assessment
Mold and moisture assessment of every accessible stud, joist and truss before drywall goes up, so your remediation contractor treats the members that are affected instead of blanket-spraying the building.
Pay to treat the wood that needs it.
When framing gets rained on, the easy answer is to treat the whole building. An accurate inspection finds the studs, blocking and trusses that actually have growth or high moisture, marks them, and gives the remediation contractor a scope by unit. Everything else is left alone, and that is where the savings are.
- Growth documented by member: stud, blocking, joist or truss, unit by unit, with photos.
- Two-pin moisture readings on the framing; wood above 19% moisture content is flagged for drying and recheck.
- Verification after treatment, so the GC has a closeout record before the walls are closed.

A wood framing assessment, start to finish.
From wet framing to a signed-off building.
Walk every unit
All accessible framing inspected for visible growth after dry-in, with thermography where it helps.
Meter and mark
Moisture readings on the framing, growth photographed and located on the member.
Risk by unit
Each unit categorized Low, Medium or High so treatment is planned where it matters.
Report and verify
A framing assessment report for the GC and remediation contractor, then a verification once treatment is done.
Large multifamily, three states.

The Chasen Apartments, Richmond, VA
Framing assessment and treatment reports building by building, as phase one of the Three Phase Program for Hourigan.

The Vivien, Vero Beach, FL
Every unit and townhouse assessed after severe weather. Growth and elevated moisture documented for the GC and the remediation contractor, and treatment completed.

One Rangers Way, Arlington, TX
Framing assessments through multiple construction phases, confirmation that the framing was treated, then final verification on floors 1 to 8.
Building outside DC, Maryland or Virginia? We come to you.
We have walked framing in Virginia, Florida and Texas. Anywhere in the US, you get the same walk, the same readings and the same report. Travel is quoted on a short call.
Flat rates by unit count.
$1,320
50 to 100 units
$2,257
100 to 150 units
$2,970
150 to 250 units
$4,455
250 to 400 units
Prices apply in DC, Maryland and Virginia. We travel anywhere in the US; projects outside the DMV are quoted with travel and logistics.
Send the project. We will schedule the walk.
Send the unit count and the dry-in date and we will set up a short call with Greg Michelsen, our industrial hygienist, and get the framing walk on the schedule before drywall goes up.
- Any stage. Before framing is best, but we can start at dry-in, drywall or gypcrete.
- Wood-frame focus. Garden apartments, 5-over-1 podium buildings, senior living and student housing.
- Free crew training. A 30-minute session for your superintendents.
- Rather talk now? Call 410-897-2629, weekdays 8 to 5.
Framing wet after the last storm?
Send the unit count and the dry-in date. We will schedule the walk before drywall goes up.