Commercial construction

Wood Framing Assessment

Mold and moisture assessment of every accessible stud, joist and truss before drywall goes up, so your remediation contractor treats the members that are affected instead of blanket-spraying the building.

19% wood moisture threshold Every unit inspected, not a sample IICRC S520 standard followed Flat pricing by unit count
Spot treatment, not blanket treatment

Pay to treat the wood that needs it.

When framing gets rained on, the easy answer is to treat the whole building. An accurate inspection finds the studs, blocking and trusses that actually have growth or high moisture, marks them, and gives the remediation contractor a scope by unit. Everything else is left alone, and that is where the savings are.

  • Growth documented by member: stud, blocking, joist or truss, unit by unit, with photos.
  • Two-pin moisture readings on the framing; wood above 19% moisture content is flagged for drying and recheck.
  • Verification after treatment, so the GC has a closeout record before the walls are closed.
Mold growth on a wood stud against ZIP System sheathing at The Chasen Apartments during a framing inspection
Growth on a single stud, The Chasen Apartments
How it works

From wet framing to a signed-off building.

1

Walk every unit

All accessible framing inspected for visible growth after dry-in, with thermography where it helps.

2

Meter and mark

Moisture readings on the framing, growth photographed and located on the member.

3

Risk by unit

Each unit categorized Low, Medium or High so treatment is planned where it matters.

4

Report and verify

A framing assessment report for the GC and remediation contractor, then a verification once treatment is done.

Where we have done it

Large multifamily, three states.

Wood framing inside The Chasen Apartments under construction in Richmond, Virginia, during a Prescient Environmental framing assessment

The Chasen Apartments, Richmond, VA

Framing assessment and treatment reports building by building, as phase one of the Three Phase Program for Hourigan.

Three Phase Program

Wood framing under construction at The Vivien in Vero Beach, Florida

The Vivien, Vero Beach, FL

Every unit and townhouse assessed after severe weather. Growth and elevated moisture documented for the GC and the remediation contractor, and treatment completed.

One Rangers Way under construction, wood framing visible on upper floors

One Rangers Way, Arlington, TX

Framing assessments through multiple construction phases, confirmation that the framing was treated, then final verification on floors 1 to 8.

Building outside DC, Maryland or Virginia? We come to you.

We have walked framing in Virginia, Florida and Texas. Anywhere in the US, you get the same walk, the same readings and the same report. Travel is quoted on a short call.

Tell us about the project

Send the project. We will schedule the walk.

Send the unit count and the dry-in date and we will set up a short call with Greg Michelsen, our industrial hygienist, and get the framing walk on the schedule before drywall goes up.

  • Any stage. Before framing is best, but we can start at dry-in, drywall or gypcrete.
  • Wood-frame focus. Garden apartments, 5-over-1 podium buildings, senior living and student housing.
  • Free crew training. A 30-minute session for your superintendents.
  • Rather talk now? Call 410-897-2629, weekdays 8 to 5.

Framing wet after the last storm?

Send the unit count and the dry-in date. We will schedule the walk before drywall goes up.